ABOUT THE PORTFOLIO
All the works expressed in this portfolio were carried out under the supervision of the owner, in different companies in different states. All works have more photos, in case of query the company will be available to offer more images and information about the work carried out.
GRUPO CRM
Responsible for branding Kopenhagen, Brasil Cacau and Kop Koffee
Location: Extrema, Minas Gerais.
Work: Cleaning the storage and logistics shed approximately 26 meters high on the outside on 3 of its 4 faces and maintenance of light spots installed in the shed at an approximate height of 6 meters.
Execution time: The work lasted 3 months, Monday to Friday from 07:00 to 17:00.
Team: The work was carried out by a total of 5 professionals, including 1 level 3 supervisor in remote supervision, 1 level 2 climber as service front leader, 2 level 1 operational climbers and 1 safety technician.















FIBRIA CELULOSE S.A
Currently Suzano Celulose
Location: Aracruz, Espirito Santo
Work: NDT inspection in the visual process and thickness measurement, internal and external repairs to boilers, silos and tanks, work in confined spaces and using rope access.
Cargo handling and tiles using lifting systems in the rope access procedure with a reduction of 2 by and 4 by 1.
Schedule planning, preparation and execution of service fronts under my responsibility as a level 2 climber, being inspection and general mechanics.





















SÃO PAULO METRO
Via 04 Yellow Cptm
Location: Luz, Paulista, Faria Lima and Butantã stations.
Work: Structural cleaning of the upper area of the station, cleaning and reorganization of protection against pigeons and cleaning of internal windows.
Time of execution: The work lasted 4 months, Monday to Friday from 00:00 to 04:30.
Team: The work was carried out by a total of 5 professionals, including 1 level 3 supervisor in remote supervision, 1 level 2 climber as service front leader, 2 level 1 operational climbers and 1 safety technician.












PATIO DAS AMERICAS BUILDING
Location: City of São José dos Campos, São Paulo
Work: Removal of excessive rubber sealing windows, cleaning windows and inspection of cracks on the building's landings, approximately 116 meters high from the highest point to the base of the building. Work performed on all sides of the building.
Time of Execution: The work lasted 3 months, Monday to Friday from 07:00 to 17:00.
Team: The work was carried out by a total of 5 professionals, 1 level 3 supervisor in remote supervision, 1 level 2 climber as front-line leader, 2 operational level 1 climbers and 1 assistant.















OCTAVIO FRIAS BRIDGE
Cable-Stayed Bridge in Sao Paulo
Location: Connection between Marginal Pinheiros and Avenida Jornalista Roberto Marinho.
Work: Inspection of the stays, verification of cracks connecting them to the bridge and inspection of the connection of the stays.
Execution time: The work lasted 1 week, Monday to Friday from 07:00 to 17:00.
Team: The work was carried out by a total of 2 professionals, 1 level 3 supervisor and 1 level 1 operational climber.